Close Menu
UAE NEWS TODAY
    What's New

    Sharjah Museums Authority launches Summer Season 2026 programmes

    July 4, 2026

    Precast concrete work begins for Dubai Loop tunnel Phase 1, weighing 100 million pounds

    July 4, 2026

    You’re 40 on paper, but is your body 50? What UAE doctors want you to know

    July 4, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    UAE NEWS TODAYUAE NEWS TODAY
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    UAE NEWS TODAY
    Home»UAE»Precast concrete work begins for Dubai Loop tunnel Phase 1, weighing 100 million pounds
    UAE

    Precast concrete work begins for Dubai Loop tunnel Phase 1, weighing 100 million pounds

    Editorial teamBy Editorial teamJuly 4, 2026
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    Precast concrete operations for the first phase of Dubai Loop are underway, with the tunnel set to weigh 100 million pounds (45,359,237kg), according to The Boring Company (TBC).

    The first phase will utilise 25,000 segments, each weighing 4,000 pounds, the company added.

    Dubai has become the second city to introduce this landmark transport project, which features a network of one-directional underground tunnels, and is designed to deliver fast, seamless travel from first mile to last mile.

    Stay up to date with the latest news. Follow KT on WhatsApp Channels.

    Popularly known as Teslas in tunnels, it was first implemented in Las Vegas. In 2025, Musk compared it to a “wormhole” where one can enter from one part of the city and exit at another. 

    On the sidelines of World Government 2026, Dubai’s Roads and Transport Authority signed an agreement with Elon Musk’s TBC to begin the passenger tunnel project.

    First 4 stations, later expansion

    The first phase of Dubai Loop will involve a pilot route extending 4miles (6.4km), comprising four stations, linking the Dubai International Financial Centre and Dubai Mall. These include: Burj Khalifa, DIFC 2, Zabeel Dubai Mall Parking and ICD Brookfield Place.

    Later, the project will expand to include up to 14 miles (22.5km) and include 19 stations, connecting the Dubai World Trade Centre and the financial district with Business Bay.

    The cost of implementing the first phase of the route is estimated at approximately Dh600 million, and is expected to be completed in one year. The total cost of the full route is estimated at Dh2.5 billion, with 19 stations, and an expected implementation period of around three years.

    Dubai Loop to cut traffic

    Dubai Loop will ease traffic for residents as it is projected to serve 13,000 people per day in its first phase, while the full route is projected to have a total capacity of approximately 30,000 passengers per day. The tunnel is also expected to cut travel time from around 20 minutes to 3 minutes.

    The tunnels will be developed using tech that enables faster delivery, lower construction costs, and reduced impact on existing roads and utilities compared with conventional transport systems, according to a statement by The Boring Company.

    Source: Khaleej Times

    Previous ArticleYou’re 40 on paper, but is your body 50? What UAE doctors want you to know
    Next Article Sharjah Museums Authority launches Summer Season 2026 programmes

    Related Posts

    Sharjah Museums Authority launches Summer Season 2026 programmes

    July 4, 2026

    UAE leaders congratulate US President on Independence Day

    July 4, 2026

    Karak, gahwa in summer: 5 UAE drinks that keep you cool as heat soars

    July 4, 2026
    Top Posts

    UAE strengthens lead on day two of UAE National Jiu-Jitsu Championship

    June 13, 2026

    UAE Team Emirates-XRG targets victory at Copenhagen Sprint with Sprinter Leading Squad

    June 12, 2026

    Saeed Al Hajeri reaffirms UAE’s commitment to strengthening partnership with New Zealand

    June 12, 2026

    ECSSR Director-General meets Vice Minister of International Department of CPC Central Committee

    June 13, 2026
    Don't Miss

    Sharjah Museums Authority launches Summer Season 2026 programmes

    UAE July 4, 2026

    SHARJAH, 4th July, 2026 (WAM) — Sharjah Museums Authority (SMA) has launched its Summer Season…

    Precast concrete work begins for Dubai Loop tunnel Phase 1, weighing 100 million pounds

    July 4, 2026

    You’re 40 on paper, but is your body 50? What UAE doctors want you to know

    July 4, 2026

    Guyanese President receives Al Zeyoudi, affirms commitment to expanding UAE economic partnership

    July 4, 2026
    2026. All rights reserved.
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Get In Touch

    Type above and press Enter to search. Press Esc to cancel.