Close Menu
UAE NEWS TODAY
    What's New

    AI and smart mobility drive UAE travel sector as ATM 2026 opens

    September 14, 2026

    Alexander Zverev beats Ben Shelton to win US Open title

    September 14, 2026

    Antonelli clinches victory in Spanish GP

    September 13, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    UAE NEWS TODAYUAE NEWS TODAY
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    UAE NEWS TODAY
    Home»Technology»SDPW to complete Midline drainage project by early next year
    Technology

    SDPW to complete Midline drainage project by early next year

    Editorial teamBy Editorial teamApril 29, 2026
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    SHARJAH, 27th April, 2026 (WAM) — Sharjah Department of Public Works (SDPW) is implementing the Midline project for rainwater and groundwater drainage at a cost of AED500 million, marking one of the emirate’s largest strategic infrastructure developments.

    The project enhances drainage efficiency across key areas through an integrated engineering system extending over long distances and serving densely populated districts. Despite much of the work being underground, it plays a critical role in preventing water accumulation, maintaining traffic flow, and safeguarding urban life.

    The development is divided into three interconnected zones. The first includes a 16 km main transmission and secondary network constructed using micro-tunnelling at depths of up to 20 metres, forming the system’s backbone and directing water towards the sea.

    The second zone comprises two main pumping stations at Al Ghubayba and Al Sour. Al Ghubayba station, with a capacity of 6.2 cubic metres per second, serves multiple areas including Al Ghubayba, Al Tala’a, Al Rifa’a, Al Shahba, Al Darari, Al Tarfa, Dasman, Samnan, parts of Industrial Area 4, Al Wahda Street, Wasit Street and Abu Shaghara Tunnel, supported by 6.6 km of collection lines.

    Al Sour station, with a capacity of 5.7 cubic metres per second, serves areas such as Al Shuwaiheen, Al Ghuwair, Al Musalla, Al Manakh, Al Yarmook, Al Mureijah, Umm Al Tarafa, Al Mahatta, Al Jubail, Al Sour, Al Nad, Al Majaz, Abu Shaghara and parts of King Faisal Road, with 3.3 km of collection lines.

    The third zone includes marine outfalls and 55 inspection chambers, ranging from 15 to 20 metres in depth and up to 12 metres in diameter, ensuring efficient maintenance and safe operations.

    The project is being delivered in two phases. The first phase, scheduled for completion by the end of 2026, covers areas including Al Nad, Abu Danig, Al Mahatta, Al Yarmook, King Abdulaziz Street and Abu Shaghara Tunnel. The second phase, expected in the first half of 2027, will extend coverage to additional districts and major roads such as King Faisal, Al Wahda and Wasit.

    Micro-tunnelling accounts for 15 km of the project, compared to just 800 metres of open excavation, minimising disruption. A total of 5,267 GRP pipes, each 3 metres long and with a lifespan exceeding 50 years, have been installed. The system operates through gravity flow, directing water to pumping stations and then to the sea.

    More than 651 workers contributed to the project, achieving two million safe working hours. Covering 4,000 hectares, the project reflects Sharjah’s commitment to resilient infrastructure capable of addressing climate change impacts and ensuring sustainable drainage services across the emirate.

    Source: Emirates News Agency

    Previous ArticleUAE Team Emirates-XRG’s Oliveira takes blistering third place in Tour de Romandie prologue
    Next Article ‘Majra’ launches agricultural category under ‘Sustainable Impact Challenge’

    Related Posts

    DEWA invites Arab Media Summit participants to learn about sustainability, innovation efforts

    September 13, 2026

    Mohammed bin Rashid Al Maktoum Global Water Award entries close 30 September

    September 11, 2026

    China launches new remote sensing satellite groups

    September 11, 2026
    Top Posts

    UAE strengthens lead on day two of UAE National Jiu-Jitsu Championship

    June 13, 2026

    UAE Team Emirates-XRG targets victory at Copenhagen Sprint with Sprinter Leading Squad

    June 12, 2026

    Saeed Al Hajeri reaffirms UAE’s commitment to strengthening partnership with New Zealand

    June 12, 2026

    ECSSR Director-General meets Vice Minister of International Department of CPC Central Committee

    June 13, 2026
    Don't Miss

    AI and smart mobility drive UAE travel sector as ATM 2026 opens

    Business September 14, 2026

    Dubai’s travel and tourism industry is increasingly turning to artificial intelligence, digital platforms and integrated…

    Alexander Zverev beats Ben Shelton to win US Open title

    September 14, 2026

    Antonelli clinches victory in Spanish GP

    September 13, 2026

    Manchester City, Brighton win in Premier League

    September 13, 2026
    2026. All rights reserved.
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.