Close Menu
UAE NEWS TODAY
    What's New

    Dubai’s tourism sector records highest visitor numbers since February as Arabian Travel Market 2026 opens

    September 13, 2026

    RTA issues 119,000 driving licences in H1 2026

    September 13, 2026

    Trump says ‘very negative forces’ bringing things up about AI ‘that won’t happen’

    September 13, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    UAE NEWS TODAYUAE NEWS TODAY
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    UAE NEWS TODAY
    Home»Technology»SEWA launches new project to enhance water supply in Kalba
    Technology

    SEWA launches new project to enhance water supply in Kalba

    Editorial teamBy Editorial teamApril 9, 2026
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    SHARJAH, 9th April, 2026 (WAM) — Sharjah Electricity, Water and Gas Authority (SEWA) has begun operating a new project to enhance water supply in Kalba city. The project consists of a high-capacity strategic connection between TAQA’s resources and SEWA’s distribution network, ensuring that growing demand is met efficiently and effectively. The total cost of the project reached AED47,510,444.

    Engineer Yousef Al Hammadi, Director of Kalba Department at SEWA, stated that the project has achieved a significant transformation in Kalba by adding 3 million gallons of water per day to the network. This increased the city’s water distribution capacity from 6 million to 9 million gallons per day, representing a 50 percent increase in operational capacity.

    He noted that the project was implemented with funding of AED25,650,381 from SEWA and AED21,860,063 from the Initiatives Committee of His Highness the President of the UAE.

    The project operates at full capacity around the clock (24/7) to directly supply SEWA’s reservoirs. It includes an advanced engineering system to ensure continuous supply, as well as the extension of 14.75 kilometers of pipelines with a diameter of 400 mm, known for their high quality and pressure resistance.

    The project also incorporated advanced control systems and the installation of high-standard control valves to ensure reservoir stability and prevent sudden surges. Electrical works included completing excavation and laying essential cables within the station yard to ensure full technical integration.

    Al Hammadi confirmed that Kalba’s water network is now fully ready and operating at maximum capacity. The new infrastructure guarantees sustainable and reliable water supplies that meet current consumer needs and support the city’s future expansion plans, thanks to the effective collaboration between SEWA and TAQA.

    Source: Emirates News Agency

    Previous ArticleDubai becomes world’s first jurisdiction to establish dedicated guidance on virtual asset issuance
    Next Article UAE: Amid uncertainty, leading henna artist conveys messages of peace through her designs

    Related Posts

    DEWA invites Arab Media Summit participants to learn about sustainability, innovation efforts

    September 13, 2026

    Mohammed bin Rashid Al Maktoum Global Water Award entries close 30 September

    September 11, 2026

    China launches new remote sensing satellite groups

    September 11, 2026
    Top Posts

    UAE strengthens lead on day two of UAE National Jiu-Jitsu Championship

    June 13, 2026

    UAE Team Emirates-XRG targets victory at Copenhagen Sprint with Sprinter Leading Squad

    June 12, 2026

    Saeed Al Hajeri reaffirms UAE’s commitment to strengthening partnership with New Zealand

    June 12, 2026

    ECSSR Director-General meets Vice Minister of International Department of CPC Central Committee

    June 13, 2026
    Don't Miss

    Dubai’s tourism sector records highest visitor numbers since February as Arabian Travel Market 2026 opens

    UAE September 13, 2026

    DUBAI, 13th September, 2026 (WAM) — Dubai’s tourism industry is increasingly demonstrating its strength, with…

    RTA issues 119,000 driving licences in H1 2026

    September 13, 2026

    Trump says ‘very negative forces’ bringing things up about AI ‘that won’t happen’

    September 13, 2026

    Defending champions UAE Bulls confirmed for next Abu Dhabi T10 era

    September 13, 2026
    2026. All rights reserved.
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.