Close Menu
UAE NEWS TODAY
    What's New

    Rabdan Academy achieves new institutional milestone with IMS aligned with 9 international standards

    August 26, 2026

    UAE insurance sector assets reach AED164.9 billion, up 6.1%

    August 26, 2026

    ‘I kept thinking about my baby’: How mothers navigate the return to work and study

    August 26, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    UAE NEWS TODAYUAE NEWS TODAY
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    UAE NEWS TODAY
    Home»Technology»DEWA saves AED40 million by re-engineering gas turbine maintenance
    Technology

    DEWA saves AED40 million by re-engineering gas turbine maintenance

    Editorial teamBy Editorial teamAugust 26, 2026
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    DUBAI, 24th August, 2026 (WAM) — Dubai Electricity and Water Authority (DEWA) has achieved significant operational and financial gains by re-engineering its major gas turbine inspection and maintenance processes, saving 229 workdays and AED40 million over seven years compared to business as usual.

    The initiative has substantially reduced maintenance outage durations, enhanced generation unit availability and optimised the utilisation of human and technical resources, delivering sustainable long-term value to the organisation and its stakeholders.

    Developed by DEWA’s Generation Division, the innovative practice received a prestigious Seven-Star Rating at the International Best Practice Competition, establishing it as a global benchmark for excellence in gas turbine maintenance.

    Saeed Mohammed Al Tayer, MD & CEO of DEWA, said, “At DEWA, we continuously transform innovation into tangible and sustainable value. Through the re-engineering of major gas turbine maintenance processes, we have significantly shortened outage durations, enhanced generation asset readiness and improved resource utilisation. This achievement strengthens the resilience, reliability and efficiency of the power generation system, enabling us to meet the emirate’s growing energy demand while maintaining the highest standards of safety and operational excellence. the seven-star rating awarded to this practice by the International Best Practice Competition reflects DEWA’s culture of continuous improvement and innovation, as well as the capabilities of our Emirati talent in developing world-class solutions that deliver measurable improvements in productivity, efficiency and asset sustainability.”

    Nasser Lootah, Executive Vice President of Generation (Power & Water) at DEWA, said, “This best practice has significantly enhanced the availability and reliability of F-Class gas turbines during periods of peak electricity demand. It has reduced operational risks, improved the effectiveness of maintenance planning and execution, and delivered substantial financial and operational benefits. The initiative further strengthens the readiness of DEWA’s generation assets and contributes to the sustainability and resilience of the electricity and water systems.”

    DEWA adopted a comprehensive and integrated approach to redesigning major gas turbine inspection and maintenance activities in coordination with Siemens Energy.

    The initiative involved optimising work sequencing, enhancing coordination between operations, maintenance and engineering teams, improving the management of specialised resources and critical spare parts, and leveraging advanced business planning and operational data analytics.

    These measures enabled DEWA to achieve globally recognised outage durations while maintaining the highest standards of quality, availability, safety, reliability and operational performance.

    In 2022, DEWA surpassed its own world record for the shortest major inspection outage of gas turbines and desalination units, breaking the benchmark it had established in 2019.

    The organisation reduced the duration of major inspection activities from 11 days to 9 days, representing an 18% improvement over the previous world record and an 84% reduction compared to the outage durations recorded in 2006.

    Source: Emirates News Agency

    Previous ArticleAbu Dhabi International Hunting and Equestrian Exhibition opens Friday
    Next Article Sharjah Ruler approves new administrative divisions for Khorfakkan

    Related Posts

    DEWA empowers customers to make more sustainable decisions through Consumption Assessment Tool

    August 26, 2026

    Nvidia plans over 15% price hike for AI servers amid rising memory costs

    August 26, 2026

    University of Sharjah launches AI-driven overhaul of academic programmes

    August 26, 2026
    Top Posts

    UAE strengthens lead on day two of UAE National Jiu-Jitsu Championship

    June 13, 2026

    UAE Team Emirates-XRG targets victory at Copenhagen Sprint with Sprinter Leading Squad

    June 12, 2026

    Saeed Al Hajeri reaffirms UAE’s commitment to strengthening partnership with New Zealand

    June 12, 2026

    ECSSR Director-General meets Vice Minister of International Department of CPC Central Committee

    June 13, 2026
    Don't Miss

    Rabdan Academy achieves new institutional milestone with IMS aligned with 9 international standards

    UAE August 26, 2026

    ABU DHABI, 26th August, 2026 (WAM) — Rabdan Academy has achieved a new institutional milestone,…

    UAE insurance sector assets reach AED164.9 billion, up 6.1%

    August 26, 2026

    ‘I kept thinking about my baby’: How mothers navigate the return to work and study

    August 26, 2026

    MENA Golf Tour expands global pathway with three qualifying schools in UK, USA

    August 26, 2026
    2026. All rights reserved.
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.